• Telephone


    01297 441026

  • E-mail


    office@adsformwork.co.uk

Company profile.

ADS Formworks was formed in August 2011 by Alan Rosindell , Darrell Legg and Shaun Legg following the unsuccessful Management Buyout of our previous employer. The company shareholding is split equally between the three Directors. The business is based in Lyme Regis Dorset but our workforce is drawn from all points of the UK.

The business is built on a very strong pool of experience gained by the three Directors drawn specifically over the past 12 years from the UK Reinforced Concrete subcontract industry.

The Directors
Darrell & Shaun Legg

Darrell and Shaun are both highly experienced shuttering Carpenters who have both over the past 20 years become non-working supervisors, successfully completing over £ 25 Million of Reinforced Concrete construction. Highlights of that period include the £ 2.7M Gerrards Cross Tesco scheme for Costain.

At Gerrards Cross 300m of 21m diameter PCC tunnel over the Chiltern railway was strengthened  with an RC outer skin poured in careful sequence either side of the tunnel to avoid eccentric loading to the pcc parabola. Once the crown sections were poured and the arch complete , backfilling commenced and the new Tesco store built over the railway.

Darrell and Shaun are both IOSH qualified and have probably built every form of RC structure in the past.

Alan Rosindell

Alan has a Main Contracting background as a trained Quantity Surveyor with Laings, Interserve and BBTA (Balfour Beatty, Tilbury Douglas (Interserve) and Deutche Asphalt Joint Venture) covering mostly Highways and Water Industry Civil Engineering work. The past twelve years have been spent with one Reinforced Concrete subcontractor as Commercial manager responsible for the full financial function of the business.